Our Projects

Universiti Malaysia Sabah

2010 – 2018 (RM0.5m)
  • Fire Fighting System: Fire alarm, hose reel, fire suppression CO2, wet riser and sprinkle.
  • Air Conditioning System: Chiller, cooling tower, VRV and split unit
  • Electrical: High voltage, Low voltage and genset

Politeknik Kota Kinabalu

2011 – 2022 (RM0.4m)
  • Fire Fighting System: Fire alarm, hose reel and fire suppression CO2.
  • Air Conditioning System: Chiller, cooling tower, VRV and split unit.
  • Electrical: High voltage, Low voltage, genset and calibration protection relay.
  • Public Address System.

Arkib Negara Cawangan Sabah

2018 – 2023 (RM0.3m)
  • Fire Fighting System: Fire alarm.
  • Air Conditioning System: Air cooled package, VRV and split unit.
  • Electrical: High voltage, Low voltage, genset and calibration protection relay.

Pusat Pentadbiran Negeri Sabah

2018 – Present (RM5m)
  • Fire Fighting System: Fire alarm, hose reel, fire suppression pyrogen, wet riser sprinkler, firemen intercom and fire hydrant.
  • Air Conditioning System: Cooling tower and pump and water treatment.
  • Electrical: High voltage, low voltage, genset and air craft warning light.
  • Sewerage Treatment Plant (STP).
  • Water Fountain.
  • Roller Shutter.